Events Calendar

Previous month Previous day Next day Next month
By Year By Month By Week Today Search Jump to month
ARA Modification Programme Config 24

Mo Smith

 

ARA Modification Process

Projects include:

SWAS (new)

LAAP-TOF (new)

EXCALABAR (upgrade)

X-Rack (baseline, new, with FAAM hygrometer)  

Chemistry 2 (new, with HCHO, Steph’s pump and Spec Rad unit).

Rack 2 (upgrade, with DLH units)

FAAM CAPS (upgrade)

TAFTS (upgrade)

DLH (window, cabling) 

Make the following role fit items:

-          TWP

-          BBR’s

-          FWVS inlet

-     Remove Back Scatter Cloud Probe from configuration drawing sheet 4 (starboard windows 3 and 4)
 

Event created 01/08/2017 11:25
Location Cranfield